LiDAR Vertical Accuracy: Exceeding Manufacturer Specs

December 18, 2015
|
Updated February 9, 2026
|

6 min read

Diagram illustrating LiDAR vertical accuracy with a plane, GPS satellites, and ground reference station.
A client told me the other day that some vendors are promising vertical accuracy of LiDAR deliverables that exceed the LiDAR manufacturer specifications for that system and asked: Is it legitimate for a service provider to promise better accuracy than manufacturer specifications? Or, are service providers overselling their LiDAR services by promising high vertical accuracies?

The short answer is “Yes”, it is possible to exceed these specifications, and “No” service providers may not be overselling their services by promising such accuracies. However, the answer is easily over-simplified and it is not a simple “yes”. Further, even though this is possible, it does not follow that it is common. So let me try to put a little context on this complex concept.

Accuracy Specifications

The first problem one runs into when reading LiDAR manufacturer “accuracy specifications” is that they are normally reporting “relative accuracies” not “absolute accuracies” of their systems. Second, these accuracy specifications are usually quite conservative. For example, Aerial Services uses the Riegl VQ-480 Corridor Mapping LiDAR System. Riegl’s spec sheet for the system says that the accuracy for the system is 2.5 cm (1 sigma at 150m above ground).

But this is 2.5 cm “relative accuracy” not an “absolute accuracy”. Relative accuracies will generally always be better (more accurate) than absolute accuracies for a given acquisition for reasons discussed below. Further, project deliverables are usually delivered with “absolute” vertical accuracies that meet certain ASPRS or NSSDA thresholds. If the specification was written using NSSDA guidelines it would be expressed at 2 sigma’s or “5.0 cm with a 95% confidence level”.

Further, this Riegl specification is expressed for a point cloud acquired at an unusually low altitude (150 meters above ground). Most projects are not flown this low and the absolute & relative accuracies degrade as the system is flown higher. How much less? This is not published with their specifications, but it would degrade as altitude increased.

Other Components Added

The final accuracy of a point cloud (or the bare earth elevation model derived from the point cloud) is a product of the LiDAR “system” and a “production process”, and not simply the ranging from the laser. A modern LiDAR system has many other components (like a GPS sensor, inertial system, mirror, aircraft, etc.) that when integrated, calibrated, and operated together all contribute error to the ultimate accuracy of the point cloud. So to get to the bottom of the question of error we have to approach it from a systems and operational level, not only from an overly simplistic “laser” perspective.

As it turns out, the accuracy of the laser ranging is actually one of the most accurate components in the whole system. The International Earth Rotation and Reference Systems Services (IERS) use laser ranging and achieve less than 1 cm accuracy when measuring the distance to geodetic satellites in orbit around the earth over 3500 miles away. (Manual of Airborne Topographic LiDAR, Michael S. Renslow, 2012, p. 246.) Although airborne LiDAR systems may not be this accurate, as it turns out the error contribution from the laser ranging is by far one of the least significant sources of overall error. Other sources of error like those introduced by the GNSS or inertial systems are far more important and are often the largest contributors to vertical error.

But “accuracy” only starts with the LiDAR system. Once the aircraft is on the ground, the point cloud must be processed. The processing of the point cloud can also contribute significantly to the achievable accuracy. For example, transformations from WGS to a local projection can be fraught with errors in the hands of a novice. The distance of the GNSS base station(s) to the LiDAR system during acquisition has a major effect on final accuracy. How well the system is calibrated plays an important role. Whether the data is aligned after flight to minimize IMU errors contributes to total error. The accuracy of the surveyed control points is important, but also, how the point cloud is processed using those control points. All of these factors (and others) in total contribute to the actual measurable error in the final deliverable.

How Vertical Accuracy is Assessed

On top of these factors, we have the practical consideration as to how (or if) the vertical accuracy of the point cloud will be assessed. ASPRS specifications and NSSDA guidelines state that base mapping accuracy must be assessed using at least 20 surveyed ground control points that are at least 3 times more accurate than the mapping being tested. This can be quite difficult and expensive. For these reasons absolute accuracy is commonly not statistically estimated in this manner. In addition, only those portions of the point cloud classified as “bare earth” are required to meet these higher accuracy specifications (“fundamental accuracy”). Those portions of the cloud obscured by vegetation and other objects are required to meet less stringent accuracies (“supplemental accuracy”).

For many projects, only a small portion of the project area may be modeled by “bare earth” classifications. For these reasons there is no way to really know how accurate the deliverable is unless resources are spent that are necessary to statistically measure (estimate) its accuracy in the different point classifications. Fortunately, there are now commercial applications that enable sound statistical sampling and objective error assessment of point clouds (see Spatial Information Solutions TopoAnalyst) and do not rely on outdated manual or visual-only assessment methods.

In Summary

When talking with your professional services provider, clarify these things:

  1. Specifications for and the methodologies that will be used to assess the relative and absolute accuracies for each deliverable,

  2. Methodologies to be used for conducting the mission and the necessary mission calibration / alignments of the LiDAR system, and

  3. Affirm that they have the experience producing similar high quality information.


In conversations with experts at Riegl, I learned two important things. First, the published specifications are actually quite conservative. Second, they have LiDAR sensor operators that do deliver bare earth point clouds with vertical accuracies that exceed the printed specifications. So it has been established in practice that it is possible. However, because the operation of these systems and the processing of LiDAR data is fraught with error in unskilled hands, it is far easier and, unfortunately, more common that LiDAR data is delivered that does not meet project specifications (whether they are tested or not).

For those purchasing professional LiDAR services, you are well advised to know your provider and “trust but verify” that their deliverables meet your specifications. Depending on the intended use of the data, it is often advisable to verify the accuracy of the deliverables to specific standards.

LiDAR is an extremely important tool in the hands of qualified professionals that is capable of providing a wealth of amazing and highly accurate geospatial information useful for engineering and land use planning. But it is incumbent upon those purchasing these professional services that they understand the fundamentals and exercise due diligence to ensure qualified professionals are capable of delivering the needed information in a quality and timely manner.

#####

Mike Tully is the President and CEO of Aerial Services, Inc.

Get Lidar News in Your Inbox

Weekly updates on lidar tech, geospatial industry news, case studies, and product reviews.

About The Author

Gene Roe - founder of Lidar News

SAM Managed geospatial services

Recent Lidar Posts

Mach9 Expands Its AI CAD Platform to Aerial Lidar and Photogrammetry

Mach9 has added support for aerial lidar and photogrammetry data to its AI CAD software,…

November 4, 2026

Hesai Holds 62% of Global Robotaxi Lidar Market, Yole Group Reports

As robotaxis move from pilot programs toward commercial scale, one lidar supplier is capturing most…

November 3, 2026
Diagram of the three-stage RandLA-Net forest lidar classification workflow using pseudo-labels

Open-Source Forest Lidar Classification: Models and Methods

A drone lidar study on canopy complexity shows how far three labeled plots can go,…

October 27, 2026
Classified aerial lidar point cloud of distribution power lines with trees flagged for vegetation management risk

Lidar for Distribution Vegetation Management: How Utilities Prioritize Tree Risk

Trees remain one of the leading causes of power outages on distribution networks, and in…

October 27, 2026

$34M Series A Funding Fuels Mach9 AI CAD for Lidar Scans

Capturing the physical world has never been faster. A mobile mapping vehicle can scan miles…

October 26, 2026

Building Digital Twins Above and Below Ground: A Two-Part Reality Capture Webinar Series

Accurate information about existing conditions is essential to successful design, construction, and asset management—but creating…

September 21, 2026

Popular Posts

Phoenix Lidar Systems

Get Lidar News in Your Inbox

Weekly updates on lidar tech, geospatial industry news, case studies, and product reviews.

Mach9 Digital Surveyor 2